Borough of Hopatcong – Roads Targeted for Repaving in 2021

Typography
  • Smaller Small Medium Big Bigger
  • Default Helvetica Segoe Georgia Times

During the council meeting on April 21, 2021 the announcement was made that Spring has Sprung – and the Borough has an estimated 7,000+ Tons of blacktop headed to Hopatcong Roads in 2021.

The following roads are being targeted for 2021 based upon the study performed by the Borough Street Scan process utilizing the Street Logix software system which measured and evaluated all the Borough roads against the National Standard for roads.

This listing of roads is out for bids at this time and not considered final until all bids are in and compared with the annual budget, understanding that we currently have variations in fuel prices.

Listing of Targeted Roads:

ROAD

Length

Width

Area (S.Y)

Tons (2")

MUNICIPALLY FUNDED ROADS

 

 

 

 

  • Hilltop Rd

1035

22

2,530.00

298.54

  • Air Castle Isle

1075

22

2,627.78

310.08

  • Skyline Dr

390

22

953.33

112.49

  • Columbia Tr

1480

24

3,946.67

465.71

  • Temple Tr

1430

22

3,495.56

412.48

  • Nebraska Tr

1300

22

3,177.78

374.98

  • Missouri Tr

625

22

1,527.78

180.28

  • Toledo Ct

175

22

427.78

50.48

  • Akron Way

400

22

977.78

115.38

  • Mountain Tr

430

22

1,051.11

124.03

  • Larson Tr

910

22

2,224.44

262.48

  • Loyola Ct

545

22

1,332.22

157.2

  • Lincoln Tr

960

22

2,346.67

276.91

  • Lincoln Way

150

22

366.67

43.27

  • Stanford Tr

735

24

1,960.00

231.28

NJDOT FUNDED ROADS - 2020

 

 

 

 

  • Broadway

3450

24

9,200.00

1,085.60

  • Monroe Trail

3050

24

8,133.33

959.73

NJDOT FUNDED ROADS - 2021

 

 

 

 

  • Durban Ave ( Hopatchung Rd to Windsor Ave)

3650

32

12,977.78

1,531.38


 

Never miss News & Events:
Submit News, Tips and Events: editor@mylakenews.com

Comments powered by CComment

Upcoming Events